I cannot say that I had much to do with the hip boards other than to move them into place by each greenhouse. This was all the handy, tiring, work of my husband. After a three day weekend, I had to go back to my day job and leave Clint to do all the hard work by himself. This is when clamps came in very handy. He put each board up, leveled them, and secured each 2" x 6" using a 1/4" bolt that was 4" long with nuts and washers. The end bows require longer bolts - 6" - to eventually connect the end walls to the bow/leg.